Brackson Construction Pty Ltd
ABN: 44610770306

Primary phone number

Secondary phone number

Fax number


Description

Benjamin Watson- Director-Second Fix Carpentry/Cabinet Making - Site Management-Project Management-Estimating

• Kalgoorlie Primary School (circa 1896)- Sash Window restoration, Earthquake render repairs • Boulder town hall (circa 1908) -Toilet upgrade, Bifold doors restoration • Kalgoorlie town hall (circa 1908)- Door Restoration and minor floor repairs • Kalgoorlie Miner building (circa 1900)- earthquake damage-structural protection works • Kalgoorlie Markets building (circa 1901)- Roof maintenance • White gum valley primary school (circa 1901) - Roof tile replacement with Lead flashings • Bakers house homestead (circa 1970’s) local heritage significance -conversion from homestead to community center o Full roof replacement, new addition, floor repairs, weather sealing, air conditioning, access compliance o Subfloor ventilation compliance -Fratelle group-Adrian Fratelle

• Army Building-Wanslea site Nth Cottesloe- (circa 1940’s) Conversion from Army Building to Early childhood classrooms o Asbestos removal, Disability compliance codes rectification, stump and bearer’s replacements, New deck built to traditional methods under current access codes, complete floor restoration, paint study New lightweight walls, ceiling restoration and new ceilings as needed, Air-conditioning installation, external contaminated site remediation Parry and Whyte Architects- Alec Whyte

• WA Maritime Museum ship wreck building (circa 1850’s) conservation and remediation works o Remove damaged roof lining (tin) and correct asbestos cleanup from prior works and replace with new o Scaffold around Batavia wreck (1629) to provide safety for asbestos cleanup and prevent contamination o Limestone replacement and pointing remediation o aggregate drain installation around perimeter o timber window restorations o Steel security bar restorations Palassis Architects-Christopher Paterson

• Wheatfield Cottage (circa 1860’s)-local Gov- staged restoration project o Remove existing doors and install custom Jarrah paneled doors o Remove asbestos lined closed in Verandah o Remove concrete floor and install Jarrah Decking City of Kwinana- Carl Boffey-Building Maintenance supervisor

David Brack-Director- Carpentry-Site Management-Heritage Second fix Carpentry-Scheduler

• Residential-Victorian Homesteads-Various Weatherboard style- (circa 1890-1920) o Re-stumping o Roof restoration ▪ Inc Hockey stick verandah restoration o Shiplap eave lining restoration (circa 1908) o Repair-stich in new floorboards to match existing o Timber matched door restoration using recycled timbers o Match/replace and repair Skirtings and Architraves • Perth Various- o Wine cellar installation into limestone bedrock maintaining Heritage horticulture and building caveat (circa 1910) o Heritage brick cleaning o Leadlight restoration and replacement o Tuckpointing patching o Complete renovation of 1930’s home. Retain and protect street frontage (circa 1930) o Jarrah floor repairs Bakers House- 1970’s (timber recycled from Kellerberrin Hotel c1906) and the Mogumber Bridge c1932) • William St- North Perth Restaurants (circa 1902) o Timber floors- restaurant up spec o Chemical grout underpinning to create footing o Conversion for purpose to restaurant (William Street Conservation Precinct)

In addition to the Heritage exposure of our Directors, Brackson Construction Pty Ltd has aligned with Nick Stevenson. A fully Qualified and experienced Heritage Stone Mason who also has plenty of exposure to stone carving, decorative stone inlays and restoration and stone letter carving
Qualification – City and Guilds London-Masonry

• Elder Building (circa 1902) o Removing the old paint off by hand o Stucco removal o Brick Tuck pointing o Limestone Pointing with black lime lines o Crack stitching using Helium rods and V rods o External lime render paneling • WA Museum Shipwreck gallery (1850’s) Palassis Architects-Christopher Paterson o Remove cement based mortar back to bedrock-all faces except frontage-prior works o Remove cement based rendered sills and profiles o Replace weathered natural limestone blocks o Lime render sills and reveals o Brick pointing o Parapet restoration and waterproofing • Fremantle town hall (circa 1887) Hocking Architects- Dinah Mujati o Paint removal o Re-molding of clock face-traditional methods o New Lime render o Crack stitching of construction cracks o Lime render profiling o Re-render/restore decorative molding-flowers to facade o Strap lintel restoration using mesh and lime render • Geraldton - Greenough (circa 1860’s) o Repair of private dwelling due to vehicular damage (Utilizing existing dislodged stones) ▪ Re-bed and point the dislodged stones back into the corner stones of the walls ▪ re-secure window framing

Memberships

Fremantle Society- Corporate membership

Principals

Benjamin Watson- Director-Cabinet Making - Site Management-Project Management-Estimating
David Brack-Director- Carpentry-Site Management-Heritage Second fix Carpentry-Scheduler
Nick Stevenson-Qualification – City and Guilds London-Masonry

Business address

10 Bluefields Parkway
Port Kennedy WA 6172

Postal address

10 Bluefields Parkway
Port Kennedy WA 6172

Professional specialisations

> Project Manager
> Trades

Service types

None

Trade types

> Architectural Mouldings
> Brickwork
> Brickwork/Tuckpointing
> Builder
> Cabinetmakers
> Carpentry/Joinery
> Concreting
> Hazardous materials/Asbestos
> Joiners
> Plastering
> Roof Carpenters/Carpentry
> Roofing
> Stone Masonry
> Tiling
> Timber/ Woodwork
> Tuck Pointing

Area of service

> Goldfields-Esperance
> Great Southern
> Peel
> Perth Metro
> South West
> Wheatbelt